1/17/2024 0 Comments Maple valley medical clinicOpenings, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.įinishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Wall Coverings, Painting. Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers. Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork. Project is to reach Substantial Completion by the following date: 210 calendar days from the date of award of contract.Ĭoncrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. No bids may be withdrawn for a period of 60 days after opening of bids. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. The new facility will provide a new primary care clinic with exam, treatment and administration functions. The work includes but is not limited to: partial removal of concrete slab for plumbing and electrical trench MEP installation partition walls (non-structural), ceilings and new finishes. in the existing core and shell building Level 1 at grade. Project consists of the tenant improvement of approximately 11,300 s.f. University of Washington Basketball Training & Operations Facility University of Washington Behaviorial Health Teaching Facilityĭemolition, New Construction, Infrastructure - 136,384 SF UW IMA Locker Rooms and Pool Upgrades Project - Bid Package #4 - All Other Workĭesign Build - UWMC OPMC Digestive Health Clinic and Endoscopy Center South Seattle College Security Office Upgrades ASUW Shell House - University of Washington
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |